0086-371-8709 1886

concrete.sales@zzbona.com

Room 605.Unit 1.Building 4. No.39 Huayuan Road, Jinshui District, Zhengzhou City, Henan Province.

Winter maintenance station

2015-09-22

Winter maintenance station

As one of the most important material in modern civil engineering concrete, concrete mixing plant is the production 

of the main equipment.Winter construction because of construction conditions and adverse environment, is the 

engineering quality accident of the season, how to correctly use and maintenance of concrete mixing plant machinery 

and equipment, is a precondition to ensure production run smoothly.

1.winter comes, should keep clear of mixing station near the drum of sandstone.Because the sand is wet, if too many 

accumulation, sand after frozen cutting drum like a grinder, cutting the drum or damage easily.
 

2.often should check whether the roller is not running a hairpin phenomenon, if the roller is not functioning, will cause 

the belt in dry friction roller, light damage to the roller, or damage to the belt.


3.it is forbidden to use high pressure water washing the floor.Due to the high pressure water is not easy to control, 

easy to splash to devices such as motors, electric cabinet, trough.Although various types of equipment are generally 

a waterproof measures, but still a lot of water under pressure will cause electrical short circuit, electric cabinet, 

such as the water condition.Trough long term bubble water easy to cause interface leakage and occurrences 

such as fault, all of these may be the cause of equipment damage and even the occurrence of safety accidents.


4.mixing station in production should be timely to exclude air compressor gas residual air in the road, because 

more easy solidified into water gas, cold weather freezes easily, may make the next oil-gas production way 

confusing or valve and cylinder block.


5.concrete mixing plant when not in production, please promptly eliminate the residual water in the water 

pump, to prevent the residual water freezes frost crack water pump.Even at the same time pay attention to 

the water in the pipe water additive to prevent water freezes in the pipeline, affect the normal production.

 

ZHENGZHOU BONA ENTERPRISE CO.,LTD.

Tel: 0086-371-8709-1886   E-mail: concrete.sales@zzbona.com

Concrete mixer Concrete batch plant Mobile Concrete mixing plant Site Index | Product Index