Mixing plant built of concrete pouring

2013-09-17

When in plant construction, you need to pay attention to some problems, mobile concrete mixing plant pouring is a big problem, if not fully prepared for the installation of, which will be produced in our mobile concrete mixing plant has a great impact in the late.   

1, the concrete pouring is completed, should be covered in less than 12 hours, and water conservation.

2 date, concrete, water conservation, mixed with retarding admixtures for concrete or impermeable requirements shall be not less than 14 days. Concrete strength before reaching the 1.2Mpa, or construction vibration must not trample on them. Conservation for more than 2 days of columns, and walls with mold, mould stripping then continue watering after conservation.

3, daily watering frequency should be able to keep your concrete enough wet state. Pouring twice a day at room temperature.   

4, large structures such as the floor, floor, roof, water conservation, cisterns for a class of works may, after the template is removed, wait until the concrete reaches a certain intensity water conservation.   

5, Jet UV curing agent in concrete form a protective film on the surface to prevent water evaporation, achieve the goal of conservation. 6, the use of plastic film cover, which should be tight and should be kept around condensate within the film. Above are some notes about pouring mobile concrete batching plant, hope can bring some help to you.