Factors affecting concrete batching plant production efficiency

2014-01-22

 

There are many factors affect the batching plant production efficiency. Now Bona tells you some important factors as follow:

concrete batch plant

1. Mixing time and utilization coefficient is the direct factors influencing the concrete mixing equipment productivity. In addition, there are many relevant factors, such as the organization of production, equipment and operation of quality management, including the technical condition of equipment operation, raw materials and transport vehicles preparation for the guarantee and improve the productivity also have a significant role.
 
2. According to civil concrete mixing station equipment, production capacity and product transportation distances, routes and road conditions, equipped with sufficient number of vehicles, generally based on productivity 1.2 times.
 
3. To sampling inspection for raw materials, different sizes of aggregates (including powder) should be stacked separately and do dustproof rainproof. Asphalt heating should be timely, to maintain a certain temperature. Aggregate storage capacity for daily dosage is more than 5 times, powder and asphalt storage and the dosage is more than 2 times a day.
 