0086-371-8709 1886

zzbona@zzbona.com

ROOM 303, FLOOR 3, BUILDING NO. 1, NO. 51, HONGZHUAN ROAD, JINSHUI DISTRICT, ZHENGZHOU CITY, Henan Province.

Concrete mixing plant operations should be checked before the item description

2013-11-28


Weight less js500 concrete mixer should be checked before the job has a lot of projects, here we give you a few items.
 
(1) drives the twin shaft concrete mixer tube and various supporting agencies, moving parts, and doors, Doumen, so there was no foreign body stuck in orbit;
 
(2) lubricating oil tank height for each compliance;
 
(3) Open the valve of the gas discharge excess water separator water gas system, the sewage drain plug open air reservoir release water mixture;
 
(4) enhance the shovel bucket or pull rope installation are correct winding reel, wire rope and pulley compliance, enhance the hopper and pull the brake shovel sensitive and effective;
 
(5) ministries bolts have been tightened, each inlet and discharge valves wear no overrun, each belt tension properly, without deviation;
 
(6) weighing device control and display all part of the work, its accuracy compliance;
 
(7) all electrical devices can effectively control the mechanical movement, the contact point and the dynamic and static contact no obvious damage.

ZHENGZHOU BONA ENTERPRISE CO.,LTD.

Tel: 0086-371-8709-1886   E-mail: zzbona@zzbona.com

Concrete mixer Concrete batch plant Concrete mix plant Site Index | Product Index