Cement silo demolition of paragraphs under barrel and hopper

2014-03-05

Cement warehouse as batch plant concrete main subsidiary equipment one, as material storage role not ignored, but cement warehouse due to volume comparison huge, in installed and demolition of process in the comparison trouble, this following will section eh less cement warehouse Middle tube body of demolition, cement tank Shang paragraph tube body (containing top cover) of demolition, cement tank demolition into material tube and how installed cement tank.
一,Paragraphs under barrel removal.Lifting wire rope hangs slightly tight to the crane hook slow lifting hook and wire rope, hopper platforms section at the end of the barrel and bolt removing the funnel, and then slowly lifting hooks, separating funnels and barrel under paragraphs under barrel after hanging to the ground.
二, the funnel removal.
1,Hopper overall demolition crane. Removed the funnel before demolition operation platform, then funnel lower part connected with the screw conveyor tubes, cloth cover and valve, disassemble a separating funnel and spiral conveyor. Check the stability of the screw conveyor before separation, before removing the valves and other heavier items, dismantling of separation after applying the hand chain hoist is tightened, drop it and release the gourd.
2.Funnel decomposition. Breaks after funnel with a 25 ton crane, lift up the bottom of the funnel back-end down onto the ground and slightly tighten wire rope, dismantle the bottom all connection screws and separate the two layers of hanging on to the bottom. Then detach the two floors to the ground on, after the separation of upper deck to the ground. Down for four detached three-story funnel cone-shaped tiles. Funnel layers when split into tiles, should reinforce the final demolition of tiles from tiles to overthrow, before decomposition can be welded on the inside of two bent pipes, after passing the checks to break down decomposition should be strictly prohibited any person entering tiles toppling range.