As for theconcrete batch plant, the regular maintenance and lubrication are the necessary working contents

1.operate concrete pump according to the corresponding requirements and methods in the maintenance manual of concrete pump. Before and after using the concrete pump, check the relevant items of concrete pump.
2.Choose the hydraulic oil of designated type for concrete pump and regularly change the hydraulic oil for hydraulic system.

3.The timely and sufficient lubrication is very necessary for the components of concrete pump.
4.Check the working conditions of hydraulic system, components of hydraulic system, electrical system and components of electrical system for the concrete pump at regular time.
5. Check the water tank, concrete cylinder and concrete delivery pipeline of pumping system for concrete pump at regular time.

6. Regularly check and adjust the torque of the fixed bolt in the cantilever crane and the rotary base of concrete pump.