0086-371-8709 1886

concrete.sales@zzbona.com

Room 605.Unit 1.Building 4. No.39 Huayuan Road, Jinshui District, Zhengzhou City, Henan Province.

Concrete mixing station in the early use of what to pay attention to

2022-01-17

 In the use of the running-in period to adhere to the concrete mixing station machine clean, timely adjustment, fastening loose parts, in order to prevent loosening and aggravate the wear of parts or parts loss; Note that the concrete mixing station often look at the changes in the instrument, abnormal, should be stopped in time.

Concrete mixing station in the period stage, pay attention to the period of working load, the running-in period of concrete mixing station work load is generally not more than 80% of the rated load, and to deploy the appropriate workload, to prevent overheating phenomenon caused by the machine long time continuous operation, to avoid the damage of concrete mixing plant and other machinery; Concrete mixing station running in period stop, should be forced to take care of the machine, do a good job of review and adjustment, at the same time pay attention to the exchange of oil.

Pay attention to check the coolant, brake fluid, lubricating oil, hydraulic oil and fuel oil (water) level and quality of the concrete mixing plant, and pay attention to the sealing of the whole machine. Check concrete batching plant found too much lack of oil and water, should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended that in the run-in period, each shift should add grease to the lubrication point.

ZHENGZHOU BONA ENTERPRISE CO.,LTD.

Tel: 0086-371-8709-1886   E-mail: concrete.sales@zzbona.com

Concrete mixer Concrete batch plant Concrete mix plant Site Index | Product Index